The 9-year contract with the Azienda Ospedaliera Policlinico di Modena provides for the execution of services and works relating to electrical, mechanical, fire-fighting, building systems and elevators (without fuel supply) of the Polyclinic and the structures now connected (outpatient clinics and external offices).
The Integrated Supervision, Automation and Consumption Monitoring System (BMS) is extended to serve all technological systems for the production of thermal, cooling and electrical energy and is aimed at optimising operation based on actual energy demand.